INTERMISSION
Slide 2
Background
"Facilities"
"Facilities"
Education
Vernal Pools
Archaeology
"Park Traffic"
Park Septic Systems
Access Road
Public Boat Launch
Gravel Parking Lots
Problems Associated with General Recreational Use
Ecologically Sound Stewardship
Park Summary
Water Chemistry
Water Budget
Sampling Sites
Water Quality Parameters
Lake George Dissolved Oxygen
Oaks Pond Dissolved Oxygen
Transparency
Selected Test Results
Selected Test Results (continued)
Selected Test Results (continued)
Selected Test Results (continued)
Phosphorus
Lake George Historical Data (MDEP)
Lake George Phosphorus
Oaks Pond Historical Data (MDEP)
Oaks Pond Phosphorus
Water Chemistry Summary
"Sarah Bostick"
Phosphorus Loading Model
Phosphorus Loading Model (continued)
Slide 37
Slide 38
Phosphorus Loading Model (continued)
Slide 40
Future Development
Future Development (continued)
Phosphorus Model Projections

Phosphorus Model Projections
Lake George Watershed
Current level = 8.6 ppb

Oaks Pond Watershed
Current Level = 9.1 ppb
Summary of Phosphorus Modeling and Future Projections
Conclusions and Recommendations
Conclusions
Phosphorus Control
Phosphorus Control (continued)
"Septic Systems"
Lake George Regional Park
Invasive Species
Fish Populations
Community Awareness
Acknowledgements
Slide 57