Gravel Parking Lots
•Close proximity to lake
•Erosion potential
•Source of sedimentation and nutrient loading
•Catch basin
•
•
•
-2 gravel parking lots in close proximity to lake on East side
-Increase erosion potential
-Source of sedimentation and nutrient loading , and therefore need to be closely monitored
-Attempts to minimize runoff in the two parking lots is advisable, may include changing the pitch so not in direction of the lake
-there is a catch basin which directs the flow of water from the parking lot into a culvert which runs under the road and serves to deposit water into surrounding vegetation. Prblem is that still diverting water toward the lake, increasing sedimentation and nutrient loading