Road Assessment Results
¥22 acres of camp roads
¥74 acres of municipal or state roads
¥Camp roads in worst condition
¥Implications for Threemile Pond
- all roads in the wateshed were ÒevaluatedÓ based on the results of the assessment and total acerage of roads were calculated
a lot of acerage of roads
-22 acres of camp roads, 74 of municipal or state roads
   -camp roads maintained by the residents of that road
   -municipal and state roads maintained by state and municipal departments
-camp roads were in the worst condition
   -makes sense, they are rarely paved and many are irregularly maintained
     -seasonal residents
     -costly to maintain, and residents are responsible for maintenance
-camp roads are invariably the roads right next to the lake, high risk for loading nutrients into threemile pond
-but problems with camp roads are specific problems that residents in the watershed can address
-pointed out solutions