-Water sampling took place on August 15th and September 11th of this year.
-All physical and chemical measurements were taken at the Characterization sites to create a comprehensive and general water profile for Threemile Pond.
-Characterization site 1, in the south-center of Threemile Pond, is the main site sampled by MDEP
-The spot sites were selected to assess factors specific to each location and included many of the same tests taken at the characterization sites, with some additional tests as well. Site 4-8
-Tributary sites were chosen to assess impacts of the major inlets and outlets for Threemile Pond.