Watershed Development Projections
�Residential Growth
–Estimate: 250 houses will be built in both China and Vassalboro by 2015
–Larger house size increases nutrient loading
–More septic systems, roofs, driveways, roads, etc.
–China: about 36 of 512 total lots remain undeveloped
-increase in house size increases amount of nutrients in watershed (especially phosphorus b/c housing will be more densley populated)
-Increase # of septic systems and subsurface wastewater disposal systems, driveways, rooftops, roads, etc.
-­