Plot Variables: ABEXY PQ ABEXY PQ ABEXY PQ Better plot quality (requires Java) Maximum time: 1.537.5153075150 3007501500 (To see an animation click on Initialize, and then repeatedly on Step. To generate a plot click on Run Full.)
The Java plotting routines are courtesy of Leigh Brookshaw.
Colby Chemistry, T. W. Shattuck, 2/22/2005